Dec 12/2023
–
Projects, Sustainability
Platform Elevation at Ramersdorf Station in Bonn, Germany
Hebetec successfully elevated 5 platform segments at Ramersdorf subway station in Bonn, each weighing between 21 to 34 tons. This task was accomplished using ESP-25-100 Presses, PA-4-8 II FU Pump, and MS-A elements, all within a swift 2-week timeframe.
Dedicated to delivering practical engineering solutions, this project enhances public accessibility at the subway station.