1697537468213
Oct 10/2023 –

News from Down Under!

Hebetec’s hydraulic equipment was utilized in the Sydney Gateway Project’s twin arch bridges over the Alexandra Canal in Australia.

Each bridge, 100m long and 25m wide, weighs around 1750t, with a 350t launch-nose and 150t steel rocker bearings.

The first (northbound) was successfully launched and lowered on permanent bearings.

Hats off to the Freyssinet Australia team! Eagerly awaiting the second bridge’s end-of-year launch.

WhatsApp Image 2023-09-18 at 14.28.31 (1)
WhatsApp Image 2023-09-18 at 12.29.50
WhatsApp Image 2023-09-18 at 14.28.30