Dec 12/2023
–
Projects, Tech and Innovation
Kariba Dam Project, Zambia
Custom Portal Frame for Kariba Dam Project
Hebetec proudly delivered a custom designed portal frame to its client Hydrokarst for the Kariba Dam Project in Zambia.
This innovative solution was designed, manufactured, and operated by Hebetec Engineering AG to safely move, install, and remove 45T weighing needles for efficient maintenance of the sluice doors.
Our portal frame ensures the integrity of the dam and contributes to the long-term safety of the Kariba Dam.